|
worrall_100709 WGN 45-13-10 The bridge has been let back down onto the abutments and they are getting ready to take out the I-beam system that the bridge had been suspended from.
Joe Nelson, P.O Box 267, Jericho, VT 05465-0267
This file posted 08/25/2010
|